Announcement Title
Notice of theAmendment in the Bid Document

KATHMANDU INSTITUTE OF CHILD HEALTH (KIOCH)

Budhanilakantha -7, Kathmandu

Notice of Amendment in the Bid Document

Based on the request and suggestions of pre-bid meeting held on 27th January 2021 the following changes are made in the bid-document.

1. Technical Criteria: Page 10

  1. General Experience

The Consultant should have General Experience as a Prime Consultant in Design and construction supervision of  multi-storied building, Commercial Buildings, Hospitals Building design, government buildings and out of which one shall be minimum of seven storied and single basement and experience of asphalt concrete road construction within last seven (7) years.

2. Clause 23 of BID document: Page 15

  1. EVALUATION OF FINANCIAL BIDS

 

    1. The Client will first evaluate the technical proposal.  The financial proposal of those Consultants who score the pass mark of 70% or more will be opened as per Quality Cost Based Selection (QCBS).

 

The lowest evaluated Financial Proposal (Fm) is given the maximum financial score (Sf) of 100.

The formula for determining the financial scores (Sf) of all other Proposals is calculated as following:

 

Sf = 100 x Fm/ F, in which “Sf” is the financial score, “Fm” is the lowest price, and “F” is the price of the proposal under consideration.

 

The weights given to the Technical (T) and Financial (P) Proposals are:

T = 80%, and

P = 20%

Proposals are ranked according to their combined technical (St) and financial (Sf) scores using the weights (T = the weight given to the Technical Proposal; P = the weight given to the Financial Proposal; T + P = 1) as following:  S = St x T% + Sf x P%.

    1. In evaluating the Proposals, the Client will determine for each Proposal the evaluated Proposal price by adjusting the Proposal price by making correction, if any, for errors pursuant to Clause 22 of ITB.

 

 

3. ATTACHMENT-1; TECHNICAL EVALUATION CRITERIA (criteria 2 Similar work Experience of consulting firm) : Page 18

2

Similar work Experience of consulting firm         

20 Marks

 

Detailed Architectural and Engineering Design and drawings of RCC frame structure of two Hospital buildings of 100 bed capacity or one Hospital building of 200 bed capacity completed successfully in last 7 years.

Similar work of consulting fee less than  Rs. 1 million will not be considered.

 

 

4. DATA SHEET-3, TECHNICAL CRITERIA: Page 28

SPECIFIC EXPERIENCE (ITB CLAUSE NO. 3.3 A. 2) — TO BE FILLED IN BY THE CONSULTANT

SN

Particulars of Construction
Projects where Consultancy
Provided

Project Particulars

  1.  

Name of Building Projects where the firm has provided Design, documentation and construction supervision of multi-storied buildings (Apartments, Commercial Buildings, Hotels, Hospitals 6 storied or more floor with single basement within  last 7 years, consulting fee not less than 1 million within last 7 years

Name
Client,
Location of
Project etc.

Gross
Floor Area

End Date

  1.  

Name of at least two  100 beds or more or one 200 bed Hospital Building Project where the firm has provided consulting services within last 7 years having consulting fee not less than 1  million for one project.

Name of
Client,
Location of
Project etc.

Gross
Floor Area

End Date